We supported our client by delivering a Pre-FEED Topsides design scope to a very tight, 11 week schedule. The complexities of this study included;
- Multiple external interfaces;
- Client based in Norway;
- Engineering partner working in Singapore; and
- The Project based in Western Australia;
- Delivering in a global pandemic, meaning everyone was remote from each other.
Our unique global capability, alongside our highly experienced Project Managers, is what allowed us to deliver this project on time and on budget. Our team had to juggle both the large range of disciplines and engineering interfaces this scope required, and also balance the needs of multiple stakeholders.
The teams clever thinking and integrated approach meant nothing was designed in isolation. This, combined with our agile can-do approach to working across time zones, in a highly pressurised environment due to the schedule, ensured our design was exactly what was needed for the winning bid.
The Xodus disciplines that worked together to deliver this integrated scope were;
WE ARE XODUS |
THIS IS WHAT WE DO |
THIS IS WHERE WE DO IT |
Environment |
Best Available Technique Assessment Emissions Report |
Perth |
Process Technical Safety & Risk Structural |
Datasheets Enhanced PFDs / UFDs Concept Selection and Process Simulation Flare & Blowdown Study Process & Utilities Systems Design Power & Heat Generation Study PFD HAZOP Structural Design Topsides Weight Estimation |
London |
Piping & Layout Technical Safety & Risk CAD Design |
3D Modelling Layout / General Arrangement Drawings HSE Philosophy HAZID / ENVID Human Factors and Working Environment Study RAM Study Structural Drawings |
Aberdeen |
Electrical C&I Mechanical |
Electrical design, philosophies, specifications and datasheets C&I philosophy and ICSS Specification Mechanical Studies (compression and driver selection, static equipment and heat exchanger selection) and datasheets |
Glasgow |
Materials & Corrosion |
Materials Selection Study |
Dubai |